[1]
Ghimire, R. et al. 2021. Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case. International Journal of Industrialized Construction. 2, 1 (Jan. 2021), 1–14. DOI:https://doi.org/10.29173/ijic236.