Ghimire, R. (2021) “Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case”, International Journal of Industrialized Construction. Edmonton, Canada, 2(1), pp. 1–14. doi: 10.29173/ijic236.