Permanent Modular Construction: Construction Performance
DOI:
https://doi.org/10.29173/mocs172Abstract
This paper reports on a portion of a study to determine the construction performance of permanent modular construction (PMC) with the goal to verify industry claims of cost and schedule. The research uses a test bed of international PMC case studies. The PMC projects recorded provide a sample to evaluate the performance metrics attributed to off-site construction. The study finds that PMC project samples were 11% more cost effective and 42% improved schedule performance when compared to traditional site built projects.Downloads
Published
2015-05-21
Issue
Section
Proceedings
License
Copyright (c) 2015 Ryan E. Smith, Talbot Rice
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
MOC Summit Proceedings are distributed under a Creative Commons Attribution-NonCommercial-NoDerivs (CC BY-NC-ND) license that allows others to download these proceedings and share them with others with an acknowledgement of the work's authorship and initial publication in these proceedings. These proceedings may not be changed in any way or used commercially.