Exploring the Benefits of Early Contractor Involvement (ECI) and the Mechanism for Automated 5D BIM Quantification Process in Offsite Modular Construction

Authors

  • Tochukwu Moses School of Architecture and Built Environment, University of Wolverhampton
  • David Heesom School of Architecture and Built Environment, University of Wolverhampton
  • David Oloke School of Architecture and Built Environment, University of Wolverhampton
  • Martin Crouch Hargreaves Ductwork Ltd

DOI:

https://doi.org/10.29173/mocs6

Keywords:

BIM, Level 2 BIM, ECI, 5D BIM, Digital quantification, Offsite construction

Abstract

The UK Construction Industry through its Government Construction Strategy has recently been mandated to implement Level 2 Building Information Modelling (BIM) on public sector projects. This move, along with other initiatives is key to driving a requirement for 25% cost reduction (establishing the most cost-effective means) on. Other key deliverables within the strategy include reduction in overall project time, early contractor involvement, improved sustainability and enhanced product quality. Collaboration and integrated project delivery is central to the level 2 implementation strategy yet the key protocols or standards relative to cost within BIM processes is not well defined. As offsite construction becomes more prolific within the UK construction sector, this construction approach coupled with BIM, particularly 5D automated quantification process, and early contractor involvement provides significant opportunities for the sector to meet government targets. Early contractor involvement is supported by both the industry and the successive Governments as a credible means to avoid and manage project risks, encourage innovation and value add, making cost and project time predictable, and improving outcomes. The contractor is seen as an expert in construction and could be counter intuitive to exclude such valuable expertise from the pre-construction phase especially with the BIM intent of äóÖbuild it twiceäó», once virtually and once physically. In particular when offsite construction is used, the contractoräó»s construction expertise should be leveraged for the virtual build in BIM-designed projects to ensure a fully streamlined process. Building in a layer of automated costing through 5D BIM will bring about a more robust method of quantification and can help to deliver the 25% reduction in overall cost of a project. Using a literature review and a case study, this paper will look into the benefits of Early Contractor Involvement (ECI) and the impact of 5D BIM on the offsite construction process.